The Winds of Change in India’s Energy Transition

India's energy transition is marked by ambitious plans to adopt renewable energy sources like solar and wind on an unprecedented scale. According to the National Electricity Plan (NEP), by 2031-32, solar and wind power are expected to constitute 364.6 GW (40%) and 121.9 GW (13.5%) respectively out of a total projected installed capacity of 900 GW. The projected gross electricity generation in 2031-32 by solar and wind has been estimated at 665.6 BU (25%) and 258.1 BU (9.68%) respectively out of total 2665.7 BU. This indicates that the average Capacity Utilization Factor (CUF) for solar and wind generation has been assumed to be 20.84% and 24.17% respectively. While these projections paint a promising future, the reality of variability, particularly in wind power generation, presents unique challenges to this transition.

Let's delve into the numbers and dissect the impact of variability on India's energy landscape, focusing particularly on wind power generation. The Central Electricity Authority (CEA) provides valuable insights into the actual generation figures for the past two fiscal years, revealing intriguing patterns.


                              (Source CEA website: https://cea.nic.in/renewable-generation-report/?lang=en)

While the NEP has assumed a CUF of approximately 24.1% for wind plants, the observed average CUF of wind power plants stood at 19.78% and 21.46% for the year FY 22-23 & FY 23-24 respectively. This indicates a shortfall of 17.93% and 10.95% with respect to the CUF for Wind generation assumed in the NEP. This discrepancy underscores the inherent unpredictability of wind energy harnessing, emphasizing the necessity for adaptive strategies within India's energy transition plan.

However, it's not just the over estimation of average CUF in NEP that warrants attention; the seasonal variability of actual wind power generation adds another layer of complexity. Analysing monthly generation data reveals fluctuating patterns, with significant deviations observed across different months.



During months of May, June, and July, wind power generation typically benefits from higher wind speeds, resulting in monthly CUF in excess of 30%. Conversely, from October to April, wind generation experiences lower monthly CUF values below 16%. Such fluctuations pose operational challenges for grid management, highlighting the need for robust infrastructure and backup mechanisms to ensure grid stability and reliability. Estimating Battery Energy Storage Systems (BESS) to meet the grid's requirements amidst such high monthly variability becomes a complex and expensive proposition. It calls for a holistic approach that incorporates technological advancements and policy interventions. Investments in energy storage solutions, grid modernization, and demand-side management initiatives are crucial to mitigate the impacts of variability and ensure a seamless transition to a renewable-centric energy landscape.

Overestimating the CUF for wind generation can have several significant implications in India's energy transition plan :

1.      Energy Shortfall: Mismatch between projected and actual generation from renewable sources, particularly wind power, would fall short of expectations. This could create a gap between projected and actual energy production, potentially leading to supply shortages and reliability issues in meeting electricity demand.

2.      Financial Cost & Misallocation of resources: Overestimating CUF can have financial repercussions, especially for investors and developers in the renewable energy sector. Projects may not deliver the expected returns on investment if they fail to achieve the anticipated levels of generation. This could slow down the pace and increase the cost of India's energy transition as more capacity will be required to be added to meet the electricity demand shortfall due to lower CUF. Besides, if planners or investors rely on higher CUF figures, they may allocate more resources or investment than necessary into wind power projects. This misallocation can divert funds from more efficient or effective renewable energy projects or other sectors crucial for energy transition.

3.      Grid stability challenges: Grid operators rely on accurate forecasts of renewable energy generation to maintain grid stability and balance supply with demand. An overestimation of CUF could create challenge for grid management.

4.      Policy Credibility: Overestimating CUF could undermine the credibility of India's energy transition plan and raise questions about the effectiveness of existing policies and incentives aimed at promoting renewable energy deployment.

5.      Environmental impact: Renewable energy deployment is crucial for reducing greenhouse gas emissions and mitigating climate change. However, overestimating CUF and subsequently falling short of renewable energy targets could delay progress towards decarbonization goals, leading to increased reliance on fossil fuels and exacerbating environmental challenges.

In conclusion, while India's energy transition journey is propelled by ambitious targets and commendable initiatives, the variability inherent in renewable energy sources, particularly wind power, presents formidable challenges. An overestimation of CUF in India's energy transition plan could have far-reaching consequences, affecting financial viability, grid stability, policy credibility, and environmental sustainability. It underscores the importance of accurate forecasting and realistic goal-setting in guiding the transition towards a renewable energy future. In short, it will delay the Net Zero Carbon transition and make it more expensive.

 

(Disclaimer: The views expressed in the blog are solely of the author and do not reflect views of his institution or associa